This massive warehouse and distribution center required a specialized flat-floor system for high-reach forklifts. The structure had to be fireproof and capable of supporting heavy industrial machinery.
Using pre-engineered steel buildings (PEB), we achieved clear spans of 60 meters without internal columns, maximizing the storage volume for the client.